(2) if the results indicate a reaction potential, the following measures must be taken:(a) hole temperature measurements must be taken before loading the explosives;
(b) drill holes whose temperature may provoke a reaction of the explosives must not be loaded, unless the temperature is controlled; and
(c) a written procedure for loading and blasting must be developed and applied; the procedure must includei. the loading sequence;
ii. the maximum delay between the beginning of the loading and the blasting;
iii. the measures to be taken in case of smoke release from a drill hole that is already loaded or being loaded; and
iv. the use of inhibitor explosives or other explosives compatible with existing conditions.